4Patrik A. Optimization of Muhi-echelon Repairable Item Inventory Systems with Simultaneous. I.ocation of Repair Facilities[J]. European Journal of Opertional Research, 1997,99 : 584-595.
5Hoong C L, Huawei S,Chuen T S. Evaluation of Time-varying Availability in Multi-echelon Spare Parts Systems with Passivation [J]. European Journal of Operational Research, 2006,170: 91-105.