摘要
介绍了工程竣工结算阶段发生的工程造价纠纷的表现及产生的原因 。
The text introduce comport of engineering cost dissension during engineering complete section and reason,transact method and prevent measure of it.
出处
《黑龙江交通科技》
2002年第6期63-64,共2页
Communications Science and Technology Heilongjiang
关键词
工程造价
纠纷处理
预防措施
engineering cost
dissension transact
prevent measure