厂用电切换引起厂变过流保护误动作的分析和研究 被引量:4

Analysis and study for switching over station power which cause station transformer over current protection false action
下载PDF
导出
摘要 电厂厂用电切换过程中 ,常因全闸冲击电流过大而引起高备变过流保护动作造成的厂用电切换失败。文章就失败原因进行了详细的分析 ,指出失败的主要原因是合闸开关的合闸速度不够快及合闸相位不当造成冲击电流过大造成了高德变过流保护动作。由于快速合闸可以减小后续电流 ,这样不会对电气设备造成危害。因此文章建议采用快速开关以减小后继电流和过流保护加小延时的策略以保证切换成功。通过现场多次试验 。 Switching over station power often cause station transformer overcurrent protection false action.This Paper makes a detail analysis for it and proposes that the dominate reason is switching over slowly and rush current over setting point which cause station transformer overcurrent protection false action.For these reasons, quick break switch and timing relay are suggested to adopt in this paper. These two means get the desiring result which is supported by experiment on spot.
出处 《安徽水利水电职业技术学院学报》 2002年第1期41-44,共4页 Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词 厂用电 过流保护 误动作 压差 初相 station power overcurrent protection false action voltage diffence pilot phase
  • 相关文献

参考文献2

二级参考文献3

共引文献2

同被引文献8

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部