摘要
本文作者结合自己多年的实际工作经验,阐述了在施工中对复杂的地质条件和不利的周围环境进行蓄水池建设和施工,提出一系列可操作的技术措施和具体的施工方案。
The author expounds how to construct impoundment basin when it is under complicated geologic condition and in bad ambience according his own perennial service experience, and offers a series of operable methods and visuahzed construction scheme.
出处
《林业科技情报》
2002年第3期25-26,共2页
Forestry Science and Technology Information
关键词
沉箱法
刃脚
抗渗性
caisson method
blade foot
permeability resistance