摘要
介绍了南津关专用水文站设站目的、水文泥沙测验及水文泥沙科研成果在葛洲坝工程建设中的运用。
The purpose of setting up the special hydrometric station at the Nanjin Pass,the hydrologic and sediment survey and the application of its results in the construction of the Gezhouba Project are introduced.
出处
《长江工程职业技术学院学报》
CAS
2002年第1期49-51,54,共4页
Journal of Changjiang Institute of Technology
关键词
南津关水文站
水文泥沙测验
成果运用
hydrometric station at the Nanjin Pass
hydrologic and sediment survey
application of results