摘要
着重介绍了斜拉桥合理成桥状态的确定方法和步骤以及与此密切相关的结构整体静力分析计算和施工计算
The method and procedure determining reasonable state of a cable stayed bridge constructed,and static computation of relative overall structure and the calculation of construction are introduced.
出处
《黑龙江交通科技》
2001年第6期41-42,共2页
Communications Science and Technology Heilongjiang
关键词
斜拉桥
静力分析
施工计算
cable stayed bridge
static analysis
construction calculation