期刊文献+

Generalized Reactive Manufacturing System

Generalized Reactive Manufacturing System
下载PDF
导出
摘要 Generalized reactive manufacturing system named GRMS is introduced. GRMS is a human-centered system based on Multi-agent. Its management and control organization is made up of three types of agents named device agent,task agent and shop-floor agent. GRMS adopts a top down and bottom- up competition and cooperation strategy based on the dynamic sifter and funnel To constrain the behavior of agents, a reward and penaity policy is introduced into the system and the closed-loop adjustment of GRMS is realized through such policy.Agents for the same task should be cooperated with each other and agents for different tasks should compete for survival in the dynamic changing environment. A distributed-hierarchical architecture with three levels of master-slave relationships among agents are proposed.Self-propelled process planning is also discussed. In order to evaluate GRMS, a time-driven simulation system-GRMOSS is developed to check the physical consistency of GRMS. Generalized reactive manufacturing system named GRMS is introduced. GRMS is a human-centered system based on Multi-agent. Its management and control organization is made up of three types of agents named device agent, task agent and shop-floor agent. GRMS adopts a top-down and bottom-up competition and cooperation strategy based on the dynamic sifter and funnel . To constrain the behavior of agents, a reward and penalty policy is introduced into the system and the closed-loop adjustment of GRMS is realized through such policy. Agents for the same task should be cooperated with each other and agents for different tasks should compete for survival in the dynamic changing environment. A distributed-hierarchical architecture with three levels of master-slave relationships among agents are proposed. Self-propelled process planning is also discussed. In order to evaluate GRMS, a time-driven simulation system-GRMOSS is developed to check the physical consistency of GRMS.
出处 《Journal of Donghua University(English Edition)》 EI CAS 2001年第2期49-54,共6页 东华大学学报(英文版)
基金 Supported by China's high technology development plan (863-511-9608-002)
关键词 control agent MANUFACTURING system FMS simulation dynamic SCHEDULING control, agent, manufacturing system, FMS, simulation, dynamic scheduling
  • 相关文献

参考文献7

  • 1Peng Si OW,Stephen F. Smith.Viewing scheduling as an opportunistic problem-solving process[J].Annals of Operations Research.1988(1)
  • 2Smith,S.F.OPIS:A Methodology and Architecture for Reactive Scheduling, Intelligent Scheduling, San Francisco: Morgon Kaufmann, M.Zweben and M.S.Fox[].eds.1994
  • 3Gou,L. et al.Holonic Planning and Scheduling for a RoboticAssembly Testbed ’ Proc of 4th Int’l Conf.On Computer IntegratedMfg. and Automation Technology, Troy, N[].Y.1994
  • 4Duffie,N.A. et al.Hierarchical and Non-hierarchic Manufacturing Cell Control with Dynamic Part-Oriented Scheduling, Proc.of the 14th North American Mfg. Research Conf[].Minneapolis.1986
  • 5Kane,K.Cooperative Scheduling System, Principles of autonomous systems, Ann Arbor, MI: Nat’l Center for Mfg.Sciences H.V.D.Parunak[].ed.1992
  • 6Berket,I. and Brown,D. C.Conflicts and Negotiations in Single Function Agent Based Design Systems, Concurrent Engg[].Research and Applications.1996
  • 7Duffie,N. A.Real-time Distributed Scheduling of Heterarchical Manufacturing Systems, Journal of Mfg[].Systems.1994

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部