摘要
本文作者介绍了灌注桩现场施工时,如何保证其工程质量,减少人工费用,降低工程成本。
In this paper author introduces spot construction of perfusion peg, and how to guarantee the quantity in engineering, how to decrease the artificial expenses and lower the engineering cost.
出处
《林业科技情报》
2001年第4期12-12,23,共2页
Forestry Science and Technology Information
关键词
灌注桩
钻孔
钢筋笼
保护层
perfusion peg
drill hole
reinforcing bar cage
protecting layer