摘要
结合水布垭溢洪道的特点 ,对岩基冲刷、空蚀、掺气减蚀、水流雾化等高速水流问题进行专题试验研究 ,提出优化措施 ,供设计参考。
Combined with the features of the Shuibuya spillway,monographic study of the problems about high-speed water flow,such as batholith washing,air corrosion,corrosion reduction of aerated flow,atomization of water flow and so on is carried out and optimization measures are put forward for reference in designing.
出处
《长江工程职业技术学院学报》
CAS
2001年第2期1-4,共4页
Journal of Changjiang Institute of Technology
关键词
溢洪道
岩基冲刷
掺气减蚀
雾化
spillway
batholith washing
corrosion reduction of aerated flow
atomization