东北电网水库群发电调度风险分析 被引量:4

Risk Analysis of Multi-reservoir Generation Dispatch in Northeast Power Grid
下载PDF
导出
摘要 针对水库调度风险分析一直为水库调度理论研究的重点及难点之一,借助东北电网水调自动化项目及多年水库调度运行经验,结合风险分析的基础理论,采用蒙特卡罗法研究了发电调度风险分析,选取一系列风险指标建立了发电调度风险分析模型,并开发了相应风险分析软件。通过在东北电网水库调度自动化系统的应用,证明了该模型计算结果的合理性,为发电调度风险分析提供了一种合理可行的途径,也给调度管理人员提供了决策支持。 It is important and difficult to study risk analysis of reservoir operation.According to reservoir dispatch automation project and operation experience in Northeast Grid,Monte Carlo method is used to study risk of generation dispatch with basic theory of risk analysis.Risk indexes are chosen to build risk analysis model of generation dispatch and the risk analysis software is developed.The developed software is applied to reservoir dispatch automation system in Northeast Grid,which proves the model is reaso...
出处 《水电能源科学》 北大核心 2010年第5期163-165,共3页 Water Resources and Power
关键词 风险分析 风险指标 水库调度风险分析模型 发电调度风险分析 东北电网 risk analysis risk indexes risk analysis model of reservoir operation risk analysis of generation dispatch Northeast Grid
  • 相关文献

参考文献4

二级参考文献22

  • 1潘敏贞,林翔岳.对水库汛期调度进行风险分析[J].海河水利,1995(2):35-37. 被引量:4
  • 2武云霞,刘俊勇,刘继春.现货交易中水电公司竞价上网研究[J].水电能源科学,2005,23(6):75-77. 被引量:5
  • 3冯平,韩松,李健.水库调整汛限水位的风险效益综合分析[J].水利学报,2006,37(4):451-456. 被引量:29
  • 4Li Tao,Shahidehpour Mohammad.Risk-constrained FTR Bidding Strategy in Transmission Markets[J].IEEE Transactions on Power Systems,2005,20(2):1 014-1 021
  • 5Kristiansen,Tarjei.Hydropower Scheduling and Financial Risk Management[J].Optimal Control Applications and Methods,2006,27(1):1-18
  • 6Zhang J L,Ponnambalam K.Hydro Energy Management Optimization in a Deregulated Electricity Mar-ket[J].Optimization and Engineering,2006,7(1):47-61
  • 7Rahimiyan Morteza,Rajabi Mashhadi Habib.Risk Analysis of Bidding Strategies in an Electricity Pay as Bid Auction:A New Theorem[J].Energy Con-version and Management,2007,48(1):131-137
  • 8Conejo A J,Nogales F J,Arroyo J M,et al.Risk-constrained Self-scheduling of a Thermal Power Producer[J].IEEE Trans.on Power Systems,2004,19(3):1 569-1 574
  • 9Yamin H Y,Shahidepour S M.Risk and Profit in Self-scheduling for GenCos[J].IEEE Trans.on Power Systems,2004,19(4):2 104-2 106
  • 10Min Liu,Wu F F,Yixin Ni.Market Allocation Between Bilateral Contracts and Spot Market Without Financial Transmission Rights[J].IEEE Power Engineering Society General Meeting Conference Proceedings,2003:1 007-1 011

共引文献49

同被引文献33

引证文献4

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部