期刊文献+

高压富水区隧道帷幕注浆止浆系统分析 被引量:23

Analysis of borehole occluding system for tunnel curtain grouting in high pressure and rich water zone
下载PDF
导出
摘要 针对圆梁山隧道高压富水区的岩溶水分布特点,确定了合理的注浆范围和注浆参数。在此基础上,设计了高压帷幕注浆的止浆系统,并对其可靠性进行了分析和验算,以确保施工安全。在工程实践中,该技术取得了预期的效果,保证了高压注浆的顺利进行,它对类似条件的注浆设计和施工具有一定的参考价值。 The suitable grouting parameters for Yuanliangshan tunnel. are verified by analyzing particular karst aquifers within high pressure and rich water zone. And a borehole occluding system is developed by above analysis; the reliability of the system was thoroughly analysed and checked in order to quarantee construction safety. This technology was applied to construction of Yuanliangshan tunnel in Chongqing-Huaihua railway; and anticipatory effects have been obtained in complex karst condition. This technology can be applied to more field under similar conditions.
出处 《岩土力学》 EI CAS CSCD 北大核心 2004年第7期1151-1154,共4页 Rock and Soil Mechanics
基金 铁道部科技计划资助项目(编号:2001G009-3)
关键词 岩溶 隧道 注浆 止浆系统 可靠性 karst tunnel grouting borehole occluding system reliability
  • 相关文献

参考文献2

  • 1陆士良 汤雷 杨新安.锚杆锚固力与锚估计术[M].北京:煤炭工业出版社,1998,11..
  • 2徐祯祥 刘月芬.全长粘结型锚杆的研究与应用[A]..岩土工程中的锚固技术[C].北京: 地震出版社,1992..

共引文献2

同被引文献186

引证文献23

二级引证文献414

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部