摘要
以某国家重点航天工程为背景,对钢筋混凝土剪力墙全钢大模板的设计方法进行了系统研究,从设计依据、要求、结构设计、制作和检验等多个环节,对全钢大模板的设计进行了系统分析,并以该重点航天工程为例对设计方法进行了应用,结构长城杯金杯奖的获得在一定程度上说明了本文所构建设计方法的有效性。
Based on a national key aerospace engineering project,steel molding board design method of reinforced concrete shear wall is proposed.Design bases,requirements,structure design methods,manufacturing and testing mechanisms are introduced systematically.Proposed design method is finally applied to a key national aerospace engineering project,and its effectiveness and efficiency are manifested by the awarding of the gold cup of the Great Wall Cup.
出处
《广东土木与建筑》
2011年第7期38-40,共3页
Guangdong Architecture Civil Engineering
关键词
航天工程
钢筋混凝土剪力墙
全钢大模板
长城杯
aerospace engineering project
reinforced concrete shear wall
steel molding board
Great Wall Cup