摘要
结合广州市西江引水工程长距离顶管穿越桥桩和路面的沉降观测结果,提出了减少地面沉降的控制措施,对相关工程提供参考。
Combining with Guangzhou Xijiang diversion long-distance pipe-jacking across the project the bridge pier and pavement,this paper putting forward to reduce the ground subsidence control measures,to provide reference for the related projects.
出处
《广东土木与建筑》
2011年第7期49-50,25,共3页
Guangdong Architecture Civil Engineering
关键词
顶管施工
沉降观测
pipe jacking construction
settlement observation