某工程冲孔灌注桩充盈系数偏高原因分析及对策 被引量:2

Cause Analysis and Countermeasures for the High of Punch Filling Pile Filling Coefficient of the Engineering
下载PDF
导出
摘要 冲孔灌注桩近年在广东等沿海地区高层建筑和桥梁基础中应用较广泛,但施工过程中常会遇到因混凝土充盈系数偏高而导致工程成本增加、利润降低的问题。文中分析某基础工程施工冲孔灌注桩混凝土充盈系数偏高的原因,探讨其解决对策,及其实施效果和经济、社会效益。 The technology of punch filling piles has more widely used in Guangdong and other coastal areas of high-rise buildings and bridge foundation in recent years.But in the process of construction often encountered due to concrete filling coefficient high and leading to increased costs,reduced profit problem.To solve this problem,in this paper,based on the analysis of the basic construction of punch filling piles in the course of concrete filling coefficient increases as the reason,to explore solutions to this problem,and measures the results achieved with the implementation of economic and social benefits.
作者 黄奕芹
出处 《广东土木与建筑》 2011年第10期19-21,共3页 Guangdong Architecture Civil Engineering
关键词 冲孔灌注桩 充盈系数 超前钻 问题对策 塌孔 效益 承载力 punch filling piles filling coefficient ahead of the drill problems and countermeasures hole collapse benefit bearing capacity
  • 相关文献

参考文献2

共引文献5

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部