银川火车站站房以回族"拱"元素塑造舒展的大跨度空间结构造型,具有时间紧、施工难度大、交叉作业频繁等特点,通过项目管理机构的优化组建,优选承包建造商,发挥技术管理作用,强化建造过程风险的控制,建立统一的组织协调机制,重视项目文化建设,创建了高效、优质铁路站房建设工程,取得了项目管理效益。
The Yinchuan train station to the arch element shaping stretch of the large span spatial structure shape,with tight time,construction difficulty is great,crossover operation is frequent wait for a characteristic,through the project management organization optimization form,preferably contracting construction business,technology management,strengthen the construction of risk control,the establishment of a unified organization and coordination mechanism,pay attention to the project culture construction,create a highly efficient,high quality of railway station construction,made project management benefit.