摘要
基于菏泽南外环路一级公路的实践,选择了冲击压实技术进行粉性土河堤高填土路基施工,提出了其施工质量控制要点和检测控制方法。
According to the practice of Heze South-outer-ring highway,this paper selects the impact compaction technology to construct the powder soil river high silt embankment,and puts its construction quality control points and inspection control methods.
关键词
冲击压实
粉性土
河堤路基
应用
impact compaction
powder soil
river embankment
application