摘要
对工作的机动时间根据其意义进行了重新调整,把工作的机动时间分成六种相互关联的时差,并对这六种时差根据他们的意义进行了定义。通过分析表明,在利用这几种时差进行网络计划优化时脉络清晰,简捷,方便。
Accordingly,the article readjust the mobile time through its meaning,divide the mobile time into 6 mobile time which is correlative,and redefine the 6 time difference by their meaning.The analysis shows that the Vein is clear,simple,convenient when using these associated time difference to optimize the network.
关键词
网络计划
时差
重新划分
定义
network plan
time difference
redistribute
definition