摘要 全球可再生能源发电装机容量中风电占有压倒性优势,今后可望成为欧洲、亚洲、北美的主要电力来源。2011年中国以62GW的累计装机容量蝉联世界第一,按照我国"十二五"规划目标,预计到2015年风电装机容量将达到1×108kW,年发电量1900×108kW.h。GWEC和Greenpeace预测,今后20年风力发电将成为世界主力电源,2030年装机容量有可能达到23×108kW,可供应世界电力需求的22%。欧美正大力开发海上风电产业。欧洲是世界海上风电发展的先驱和产业中心,欧洲企业不仅拥有自己的核心技术,而且还向世界各地输出技术,今后欧洲海上风力发电将急速增长。美国采取与英国、德国等欧洲厂家相同的战略,大力发展海上风力发电。我国海上风电产业刚刚起步,预计2015年海上风电装机500×104kW。日本学者大岛教授推算了不同电源的发电成本:包括政府财政补贴,运行年限30年的核电站发电成本为12.06日元/(kW.h);按标准设备利用率,风力发电成本11.30日元/(kW.h),与核电相比已经有竞争力。假设风况好时设备利用率达到35%,发电成本为7.95日元/(kW.h),比核电低得多。 Wind power accounts for a predominant share of the world′s installed renewable energy-based power generating capacity and is expected to become the main source of electricity in Europe,Asia and North America.In 2011,China′s installed wind power generating capacity stood at 62GW,the largest worldwide.According to the country′s Twelfth Five Year Plan,China′s installed wind power generating capacity will reach 1×108kW and annual wind power output will reach 1900×108kW·h by 2015.GWEC and Greenpeace have both predicted that wind power will be a key source of electricity for the world in the next 20 years.By 2030,the world′s installed wind power generating capacity is expected to hit 23×108kW,representing 22% of the world′s electricity demand.European and American countries are stepping up their effort to develop offshore wind power resources.Europe was the first region to develop offshore wind power resources in the world and remains the center of this industry.European enterprises not only have their own core expertise but are also exporting technology to other parts of the world.Europe′s offshore wind power industry is expected to grow rapidly over the next few years.The United States has adopted a similar strategy to European countries such as the United Kingdom and Germany in developing offshore wind power.China has just started out in developing offshore wind power and its installed offshore wind power generating capacity is expected to reach 500×104kW by 2015.According to a Japanese professor′s calculations of costs of generating electricity using different energy sources,if government subsidies are included,the cost of a nuclear power station with a 30 year life is 12.06 yen/(kW·h);and if as per the standard equipment utilization factor,the cost of a wind power plant is 11.30 yen/(kW·h).This suggests that wind power is more competitive than nuclear power.Assuming the equipment utilization factor reaches 35% when good wind conditions are available,the cost of wind power generation will be only 7.95 yen/(kW·h),much lower than that of nuclear power generation.
作者 罗承先
出处 《中外能源》 CAS 2012年第3期24-31,共8页 Sino-Global Energy
关键词 风力发电 海上风电 装机容量 电力需求 发电成本 设备利用率 wind power generation offshore wind power installed generating capacity power demand cost of generating electricity equipment utilization factor
  • 相关文献

参考文献1

二级参考文献5

  • 1刘琦,许移庆.我国海上风电发展的若干问题初探[J].上海电力,2007,20(2):144-148. 被引量:26
  • 2European Wind Energy.Association.The European offshore wind industry-key trends and statistics 2009[EB/OL].http://www.windkraft-journal.de/bilder/10_01/offshore%20stats%2020092.Pdf.
  • 3然旺.中国,下一个海上风力发电热点[R].挪威:北海国际石油天然气展会,2010.
  • 4世界银行.中国海上风电及大型陆上风电基地面临的挑战:欧洲五国海上风电政策评述[EB/OL].http://siteresources.world bank.org/EXTNEWSCHINESE/Resources/3196537-1202098669 693/wind_power_cn.pdf.
  • 5王颖春.东海大桥项目并网在即海上风电上演"圈海"[N].中国经济导报,2009-07-04(A04,A05).

共引文献26

同被引文献614

引证文献75

二级引证文献216

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部