摘要 近年来,在沙特阿拉伯,由于水平井的钻探,使产层的泄油面积明显增加,一些油气田的产量也在增长。在完井作业中,需要下入多级增产系统(MSS)完井管柱,但在致密气藏深水平井中,出现下入困难甚至管柱被卡现象。分析认为,井眼的完成、不同压力体系的多套地层、井眼的准备以及下入的技术和程序等因素,是影响管柱组合顺利下入的关键。实践证明,对于存在多套低压层的井眼,钻井设计时,技术套管应尽可能深下,封住上部低压非生产层,最好将套管鞋坐封在生产层内。应在井眼安全的情况下,将钻井液密度调低,以减轻低压层的过平衡压力;一旦发生黏卡,缓慢降低钻井液密度,并小幅活动管串,是解卡的唯一途径。在可能存在台阶的水平井段,用模拟完井管串结构的钻具组合(BHA)通井,可以消除机械卡钻风险,为大尺寸尾管顺利下入创造条件。 In recent years,the drilling of horizontal wells has enabled significant increases in drainage areas of the productive zone,and it has resulted in production increases in some oil and gas fields in Saudi Arabia.A special completion string named Multistage Stimulation Systems(MSS) is required to be run in hole during well completion.But the deployment of these assemblies into deep and long reach horizontal wells was initially problematic,such as string got obstructed and even stuck.Construction of the wellbore,deploying through multiple layers with various reservoir pressures,preparation of the wellbore before running the string,and techniques and procedures of running in hole are the key of affecting successful running of the string assemblies.Field practice has proved that intermediate string should run deep as far as possible when drilling design in the hole among multi-set low-pressure strata so as to seal upper low-pressure nonproductive formations and to set down casing shoe into productive zones.Under the condition of wellbore safety,density of the drilling fluid may be low for making overbalance pressure of the weak zones lower.Once sticking,the density of the drilling fluid should be dropped slowly and string may be moved at small range.At the horizontal hole section with steps probably,BHA simulated completion string structure may be applied to run gauge cutter with the result of removing mechanical drilling pipe sticking,which will provide condition for successful running of large-size tail pipe.
出处 《中外能源》 CAS 2012年第3期47-50,共4页 Sino-Global Energy
关键词 致密气藏 水平井 完井管柱 卡钻 技术难点 tight gas reservoir horizontal well completion string pipe sticking technical difficulties
  • 相关文献

参考文献11

  • 1刘禧元,夏廷波,张权.粘附卡钻机理与实践探讨[J].吐哈油气,2009,14(3):271-274. 被引量:18
  • 2范志国,木哈塔尔,贾永红,谷豪彬,胡新兴.多靶浅层水平井轨迹控制及尾管柱下入技术[J].石油钻采工艺,2009,31(2):32-34. 被引量:13
  • 3王兆会,陈嘉陵,王新东.HW9801水平井复杂情况的处理及分析[J].石油钻探技术,2006,34(3):81-83. 被引量:14
  • 4魏凤勇,韩敏,卓景军.利用负压解除压差卡钻[J].断块油气田,2000,7(2):60-61. 被引量:1
  • 5MCDANNIEL B W,EAST L,HAZZARD V.Overview of stimulation technology for horizontal completions without cemented casing in the lateralSPE Asia Pacific Oil and Gas Conference and Exhibition,2002.
  • 6SEALE R.An efficient horizontal open hole multistage fracturing and completion systemsInternational Oil Conference and Exhibition in Mexico,2007.
  • 7SOLARES J R,GIRALDO F,AL-MARRI H,et al.Successful multistage horizontal well fracturing in the deep gas reservoir of Saudi Arabia:field testing of a promising innotive new completion technologyCIPC/SPE Gas Technology Symposium Joint Conference,2008.
  • 8AL-FAWWAZ A,AL-MUSHARFI N,BUTT P,et al.Formation evaluation while drilling of a complex Khuff-C carbonate reservoir in Ghawar field,Saudi ArabiaSPE Middle East Oil and Gas Show and Conference,2007.
  • 9RABAA A S,ABASS H H,MOUSA T S.Drilling and completing horizontal wells in unconsolidated sandstone reservoir in Saudi Arabia:a rock mechanics viewSPE Saudi Arabia Section Technical Symposium,2009.
  • 10HAMADA G M,AL-AWAD M N J,AL-BLEHED M S,et al.Contribution of horizontal drilling technology in the develo-pment progress of Saudi oil fieldsEngineering Journal of The University of Qatar,2001.

二级参考文献8

共引文献42

同被引文献18

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部