摘要
介绍了中国石化长岭分公司8 000 kt炼油建设时在油罐区边生产、边施工中确保直接作业环节的管理方法,在项目施工管理中进行风险识别与风险评估,重点识别人的不安全行为,物的不安全状态,全面识别控制开工、施工、管理中的风险,保证了直接作业环节中边生产、边施工的安全。
This paper presents the management methods for the construction safety in direct operation link during production in oil tank area of the 8-million-ton oil refining project of SINOPEC Changling branch.Risk identification and risk assessment are carried out in the project construction management,focusing on identification of the unsafe behavior of people,unsafe state of objects,overall identification and controlling of risks before construction and during the process of construction and management,to ensure the construction safety of direct operation link during production.
出处
《石油化工安全环保技术》
CAS
2012年第2期10-12,3,共4页
Petrochemical Safety and Environmental Protection Technology
关键词
危害识别
直接作业环节
安全管理
Hazard identification
Direct operation link
Security management