介绍了老火力电厂加装脱硝装置的工艺流程,并对一些主要设备的布置要求及改造方式作了说明。老火力发电厂加装脱硝装置是必然趋势,会像烟气脱硫一样得到广泛推广。
Introduction of the old power generation equipment installation of SCR(Selective Catalyst Reduction)process and some of the major equipment layout requirements and alteration ways are described.Installation of NOx device in old power generation equipment,as an inevitable trend,will be used widely as FGD(Flue Gas Desulfurization).
出处
《上海电气技术》
2010年第2期49-53,共5页
Journal of Shanghai Electric Technology
关键词
老火力发电厂
加装脱硝装置
布置要求
改造方式
old power generation
SCR equipment installation
layout requirements
alteration ways