摘要
如前文(参见本刊2012年第二期作者的《伊朗Buy-back合同及其合同管理》)所述,伊朗油田Buy-back合同是一种对合同者比较苛刻的合同,合同者应根据工程项目的主要情况及总承包合同内容,确定项目合理的管理目标、模式、组织机构和职责分工;根据项目的工程内容、投资、工期及技术规范标准。
In this article:in the last issue,Mr.Guo and his colleagues introduced the concepts and know-how of buy-back contract in Iran in On Buy-back Contract and the management in Iran.This time,the authors present a whole process to fulfill such a contract successfully,including decision of management mode,planning of key points,management of purchasing,and the control of designing,construction and etc.
出处
《石油化工建设》
2012年第3期25-29,共5页
Petroleum and Chemical Construction