地铁屏蔽门预留空洞及预埋件施工技术 被引量:3

Construction Technology of the Reserved Cavitation Door Openings and Embedded Parts of the Metro Platform Screen Doors
下载PDF
导出
摘要 介绍广州地铁五号线猎德站站台屏蔽门土建预留空洞及预埋件施工过程,探讨其施工质量控制方法及要点,强调重视施工中的放线定位、轴线复核、现场监督、质量控制等环节,从而预防和杜绝施工质量通病及事故,确保工程质量创优。 The paper mainly discusses on the construction quality control method and key points of the reserved cavitation door openings and embedded parts during the construction of the metro platform screen doors through the description of the construction case of Liede Station in Guangzhou subway transportation line No.5.It emphasizes the implementation link of the fix location positioning,the axis recheck,field supervision on sit,quality control during the engineering construction so as to ensure the project can be otained the demands of good engineering quality and prevents the common quality defects and completely precludes construction quality accidents.
作者 雷西锋
出处 《广东土木与建筑》 2012年第3期28-30,共3页 Guangdong Architecture Civil Engineering
关键词 站台屏蔽门 放线定位 轴线复核 质量控制 metro platform screen doors fix location positioning axis recheck quality control
  • 相关文献

同被引文献12

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部