2Gampe F,Priesett K,Bentall R H.A Modular Docking Mechanism for In -orbit Assembly and Spacecraft Servicing[].th Aerospace Mechanisms Symposium Proceeding.1985
3Kawano,Isao,Mokuno,Masaaki.Automated Rendezvous Docking System of Engineering Test SatelliteⅦ. AAS 97-467 .
4International Space Station Familiarization. http://www.isc.nasa.gov/er/seh/spaceid.htm . 1998
5Keneth A B,George E C.The Apollo Docking System[].th Aerospace Mechanisms Symposium.1970
6Schliesing J.Dynamic Analysis of Apollo -Salyut/Soyuz Docking[].th Aerospace Mechanisms Symposium.1972
7Siamak G,Matthew S,John M,John S,Tim B.Space Shuttle Docking to Mir MIssion-1[].AIAA---CP.
8Urgoiti E,Belikov E M SENER,Las Arenas,Vizcaya SPAIN.Docking Berthing Systems for International Space Station[].A Proposal for CRV Docking and Berthing System.
9Tobias A,Venditti F,Cable M.Docking Berthing Systems:Functions and Simulation[].Procnd European In -orbit Operations Technology Symposium.1989
10Polites ME.An Assessment of the Technology of Automated Rendezvous and Capture in Space. NASA/TP-1998-208528 .