摘要
通过对延迟焦化装置现有分馏塔底防止结焦的循环过滤方案运行状况进行分析,提出了对塔底循环油过滤流程的改造方案。
Based on analysis of operation status of anti-coking filtering process at the bottom of the fractionating tower in delayed coking unit,the improvement method for the circulating filtering process was put forward.
出处
《辽宁化工》
CAS
2012年第1期35-36,45,共3页
Liaoning Chemical Industry
关键词
延迟焦化
塔底循环过滤
改造方案
Delayed coking
Bottom circulating filtering
Improvement method