摘要
伯方煤矿为了防止水害事故的发生,对3108(I)回风顺槽、3110采空区积水进行了设计,实施了严格的探放水制度,为今后工作面探放水积累了经验。
To prevent water accidents,the No.3108(I) return air laneway and the No.3110 goaf were designed in Bofang mine.Severe prospecting and draining water system was implemented,which could be useful for future work.
出处
《山西煤炭》
2012年第11期57-58,共2页
Shanxi Coal
关键词
积水量
钻孔布置
放水点
water accumulation
borehole layout
water empty point