湘潭二期1×600MW机组降压送出系统研究 被引量:1

Study on Scheme of Connecting Xiangtan Power Plant StageⅡ1×600MW Generating Unit to Hunan Power Grid with Lower Voltage
下载PDF
导出
摘要 为符合国家节能减排政策,降低系统网损,并缓解云田500kV变下网压力,湘潭二期1×600MW机组降压送出工程将在2012年实施。研究表明,湘潭二期1×600MW机组通过1回220kV大截面导线接入白马垄220kV变电站是适宜的。 To fulfiill the country policy of energy conservation and emission reduction,lower network loss,and alleviate the supply pressure of Yuntian 500kV substation,Xiangtan power plant stageⅡ1×600MW generating unit is going to connect to the Hunan power grid with lower voltage in 2012.The study shows it is feasible that Xiangtan power plant stageⅡ1×600MW generating unit connects to Baimalong 220kV substation with one 220kV big cross section tranmission line.
出处 《华中电力》 2012年第2期29-33,共5页 Central China Electric Power
关键词 湘潭二期 接入系统 潮流迂回 安全稳定 N-1校核 年费用 节能减排 Xiangtan power plant stageⅡ connection to the grid load flow bypass security and stability N-1 check overall annual cost energy conservation and emission reduction
  • 相关文献

参考文献3

  • 1王振宇.湘潭电厂二期1×600MW机组降压送出系统研究[R]湖南省电力勘测设计院,2010.
  • 2国家电网公司.DL/T 5429-2009,电力系统设计技术规程(试行)[S],2009.
  • 3中华人民共和国能源部.SD 325-1989,电力系统电压和无功电力技术导则(试行)[S],1989.

同被引文献5

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部