摘要
随着现代城市高层建筑的日益增多,对地下工程的施工工期及防水工程的质量提出了更高的要求。因此,有必要改进地下防水工程的构造,缩短地下防水工程的施工工期,并进一步提高防水工程的施工质量。
With the development of the high-rise in modern cities,the construction period and the quality of the water proofing work in the underground engineering are required a higher level.So it is necessary for us to improve the structure of the underground waterproof engineering,cut down its construction period,further more improve its construction quality.
出处
《哈尔滨职业技术学院学报》
2009年第5期111-112,共2页
Journal of Harbin Vocational & Technical College
关键词
地下工程
混凝土
加强带
underground engineering
concrete
reinforcing band