火力发电厂脱硝改造工程造价影响因素分析 被引量:5

Analysis of Influencing Factors on the Cost of Denitrification Projects for Thermal Power Plants
下载PDF
导出
摘要 随着最新《火电厂大气污染物排放标准》(GB 13223—2011)的颁布实施,火电厂氮氧化物的排放限值越来越严格,脱硝改造工作迫在眉睫。控制工程造价最有效的阶段应当是工程设计阶段,针对影响脱硝改造工程造价的因素,如脱硝工艺的选择、装机容量、燃料种类、脱硝改造预留程度、配套改造工程量和工程建设期等进行了分析和讨论,并结合实例进行了详细分析。 With the implementation of the new national standard 'Emission Standard of Air Pollutants for Thermal Power Plants',the emission limit of the nitrogen oxide has become tighter and tighter,then more denitrification projects are needed to be installed in the existing power plants to meet the new denitrification emission limit.Design stage is the key point of controlling the construction cost,influencing factors on construction cost of denitrification projects during the design stage such as selection of process,unit capacity,flue type,design allowance for denitrification projects,reconstruction workload and project period are analyzed in this paper,and discussion is carried out combining with the living example.
出处 《中国电力》 CSCD 北大核心 2012年第9期91-93,共3页 Electric Power
关键词 火力发电 烟气脱硝 改造工程 工程造价 影响因素 fossil-fired power denitrification projects reconstruction project cost of construction influencing factors
  • 相关文献

参考文献4

二级参考文献19

共引文献69

同被引文献39

引证文献5

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部