期刊文献+

南水北调大型埋地PCCP工程耐久性设计 被引量:3

Durability design of construction of large-scale embedded PCCP for Mid-Route of South-toNorth Water Transfer Project
下载PDF
导出
摘要 本文对南水北调中线工程中采用的预应力钢筒混凝土管(PCCP)耐久性设计的有关要点进行了讨论,具体包括:(1)工程布置设计;(2)预应力钢丝质量控制;(3)混凝土砂浆质量控制;(4)防腐蚀设计;(5)结构计算及安全评价;(6)施工安装工艺等。 The key points related to the durability design of the pre-stressed concrete cylinder pipe(PCCP)adopted in the Mid-Route of the South-to-North Water Transfer Project are discussed herein,i.e.(1)the design of the project layout;(2)the quality control of the pre-stressed steel wire;(3)the quality control of the concrete mortar;(4)the anticorrosion design;(5)the structural calculation and safety assessment;(6)the construction technology of the installation;etc.
出处 《水利水电技术》 CSCD 北大核心 2012年第4期53-56,共4页 Water Resources and Hydropower Engineering
关键词 PCCP 耐久性设计 南水北调工程 pre-stressed concrete cylinder pipe(PCCP) durability design South-to-North Water Transfer Project
  • 相关文献

参考文献7

二级参考文献7

  • 1北京市水利规划设计研究院.南水北调中线京石段应急供水工程(北京段)惠南庄-大宁段初步设计报告(修订本)[R].2004.
  • 2AWWA Manual M9, Concrete Pressure Pipe[ S].
  • 3AWWA Manual M11, Steel Pipe: A Guide for Design and Installation [ S ].
  • 4ANSI/AWWA C304 - 99, Standard for Design of Prestressed-Concrete Cylinder Pipe [ S ].
  • 5ANSI/AWWA C301 -99, Prestressed Concrete Pressure Pipe, Steel- Cylinder Type, for Water and Other Liquids[ S].
  • 6NACE RP 0100 - 2004, Cathodic Protection of Prestressed Concrete Cylinder Pipeline [ S ].
  • 7GB/T19685-2005,预应力钢筒混凝土管[S].中国国家标准化管理委员会.

共引文献34

同被引文献13

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部