期刊文献+

宽尾墩-跌坎底流消能工试验研究 被引量:6

Experimental research on bottom-flow energy dissipater of flaring gate pier and drop sill
下载PDF
导出
摘要 针对某水电工程泄洪量大、单宽流量大、佛氏数低且河床易冲刷的特点,采用水工模型试验的方法对底流消能工、宽尾墩底流消能工、跌坎底流消能工及宽尾墩-跌坎底流消能工4个方案的消能效果进行了对比研究。结果表明,宽尾墩-跌坎底流消能工方案在典型工况下消能充分,出池水流衔接平顺,对下游河床冲刷较轻。详细介绍了4个消能方案的布置形式和试验过程,可为同类工程参考。 In light of a hydropower station that is characterized by large flood and unit-width discharges,small Froude number and easily scoured of river bed,4 energy dissipation schemes of bottom flow energy dissipater,bottom-flow energy dissipater of flaring gate pier,bottom-flow energy dissipater of drop sill and bottom-flow energy dissipater of flaring gate pier and drop sill are designed and their energy dissipation effectiveness are compared and researched by hydraulic model test.The test results show that under typical operation condition,for the bottom flow energy dissipater of flaring gate pier and drop sill,the effectiveness is the most obvious,the scouring to the downstream river channel is lighter and the transition flow at outlet is smooth.It gives a detail presentation to the layout and test process of 4 schemes,which can be referred for similar projects.
出处 《人民长江》 北大核心 2012年第21期79-81,共3页 Yangtze River
关键词 联合消能工 宽尾墩 跌坎 泄洪消能 combined energy dissipater flaring gate pier drop sill flood discharge and energy dissipation
  • 相关文献

参考文献7

二级参考文献19

共引文献111

同被引文献39

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部