期刊文献+

三峡水库蓄水后上下游站水文资料整编优化分析 被引量:4

Analysis of compilation optimization of hydrological data in upstream and downstream stations of Three Gorges Project before and after impoundment
下载PDF
导出
摘要 随着江河各类水利工程的大量新建,涉水工程对水文站网的测验及资料整编的影响日益突出,已经成为当前水文测验及资料整编工作中亟待解决的问题。通过对三峡水库蓄水前后上下游站水位-流量关系和单断沙关系进行对比分析,提出了蓄水后库区、坝区、坝下游各测站的流量、泥沙测验及资料整编优化方法。采用优化后的整编方法,可使区域各站的水文测量精度及成果准确性明显提高。 With the construction of massive water conservancy projects,whose influence on survey and data processing of hydrologic stations begin to emerge.By comparing the stage-discharge relation and the relation of single-section sediment(the relationship between single sample and cross section sediment concentrations) in the upstream and downstream stations before and after the operation of Three Gorges Project,the optimization method for discharge and sediment survey in reservoir region,dam site and downstream area and data processing is put forward.The results show that the precision of the hydrological survey and the correctness of the data are improved after adoption of the optimal method.
出处 《人民长江》 北大核心 2012年第23期18-21,32,共5页 Yangtze River
关键词 水文站网 流量 水文测验 资料整编 三峡水库蓄水 hydrological network discharge hydrological survey data processing impoundment of Three Gorges Reservoir
  • 相关文献

参考文献2

二级参考文献2

共引文献14

同被引文献16

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部