摘要
针对该工程地形地质和枢纽布置的特点,对溢洪道5个泄槽及左、右泄洪冲沙底孔的挑坎体型进行了若干修改方案的比选,最终推荐的方案较好地解决了泄洪消能及下游水流对B20堆积体的淘刷问题,可供类似工程参考。
According to the geology and topography of this project and the charecteristics of the general layout,contrast some modification scheme of the five spillway chutes and the bucket body of left,right bottom hole for flood discharge and flushing,finally the recommended scheme was better to solve the energy dissipation.
出处
《水利科技与经济》
2012年第10期22-25,共4页
Water Conservancy Science and Technology and Economy
关键词
消能
挑坎体型
试验
研究
energy dissipation
bucket body
experiment
research