某碾压式沥青混凝土心墙坝竣工期工作性状浅析 被引量:1

Initial Analysis on the Working Characteristics for the Asphalt Concrete Core Dam under Time of Completion
下载PDF
导出
摘要 某碾压式沥青混凝土心墙砂砾石坝,在大坝竣工后采用三维非线性有限元法模拟大坝施工过程进行了反演算,结合施工期间对大坝应力应变、温度等监测数据,对大坝竣工期工作性状进行了对照研究,浅析施工过程对大坝工作性状的影响,进一步复核大坝设计的合理性与安全性。 For a sand-gravel dam with roller compacted bituminous concrete core,after the completion of the dam,by three-dimensional nonlinear finite element method,construction process of the dam was simulated.With the monitoring data of stress-strain and temperature of the dam in construction period,working characteristics of the dam under time of completion was controlly studied.Initially analysing the effect of the construction process to the working characteristics,further rechecking the rationality and safety of the design of the dam.
作者 张宏军
出处 《水利科技与经济》 2012年第10期74-76,78,共4页 Water Conservancy Science and Technology and Economy
关键词 沥青混凝土 心墙坝 工作性状 asphalt concrete core dam working properties
  • 相关文献

参考文献2

  • 1新疆水利水电科学院.某大坝安全监测简报[M]乌鲁木齐:新疆水利水电科学院,2008.
  • 2朱晟;韩朝军.某大坝碾压沥青混凝土心墙坝静力计算分析[D]南京:河海大学,2008.

同被引文献4

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部