临河热电厂1#汽轮机安装及试运问题分析

1#Steam Turbine Installation and Commissioning Problem Analysis in Linhe's Thermal Power Plant
下载PDF
导出
摘要 针对临河电厂新建2×300 MW工程所安装的QFSN-300-2-20B300 MW汽轮发电机的1#机组在安装运行中出现的振动问题进行了分析研究,进行了详尽的调查和分析后得出了结论,施工前的技术审查和施工中的质量追踪是机组安装中的重要环节,在汽轮机安装中必须严格审查程序和质量监督,这是工程质量提高的保障。 In view of Linhe Power Plant's 2 x 300 MW engineering installation of QFSN-300-2-20B300 MW turbine generator1#unit,the vibration problem in the construction & operation is analyzed.After careful investigation and analysis,a conclusion is reached that pre-construction technical review & construction quality tracking are important links and that review procedures and quality supervision must be strictly carried up in steam turbine installation.This is the project quality guarantee.
出处 《电力学报》 2012年第5期537-540,共4页 Journal of Electric Power
关键词 汽轮机 轴承 安装 振动 审查 监督 electric power construction turbine bearing installation vibration examination supervision
  • 相关文献

参考文献2

  • 1赵常兴.汽轮机组装技术手册,2001.
  • 2张景泰.汽轮机转子检修规程,2000.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部