针对临河电厂新建2×300 MW工程所安装的QFSN-300-2-20B300 MW汽轮发电机的1#机组在安装运行中出现的振动问题进行了分析研究,进行了详尽的调查和分析后得出了结论,施工前的技术审查和施工中的质量追踪是机组安装中的重要环节,在汽轮机安装中必须严格审查程序和质量监督,这是工程质量提高的保障。
In view of Linhe Power Plant's 2 x 300 MW engineering installation of QFSN-300-2-20B300 MW turbine generator1#unit,the vibration problem in the construction & operation is analyzed.After careful investigation and analysis,a conclusion is reached that pre-construction technical review & construction quality tracking are important links and that review procedures and quality supervision must be strictly carried up in steam turbine installation.This is the project quality guarantee.
出处
《电力学报》
2012年第5期537-540,共4页
Journal of Electric Power
关键词
汽轮机
轴承
安装
振动
审查
监督
electric power construction
turbine
bearing
installation
vibration
examination
supervision