输电线路“2×一牵三”张力架线施工工艺 被引量:1

Construction Process of "2×One Pull Three" Tension Stringing on Transmission Line
下载PDF
导出
摘要 随着电力建设的迅速发展,输电线路的电压等级越来越高,对施工机械设备的配套要求也越来越高,如果沿用传统的架线施工工艺,一部分常规的机械设备将不能满足负载要求,造成资源浪费和成本加大。通过技术创新,应用新型的"2×一牵三"张力架线工艺,使现有机械设备负载基本满足要求,避免了大量采购新设备,节约大量资金,且施工效率得到提高,开创了输电线路张力架线施工的新工艺。 With the rapid development of electric power construction,the voltage level of power transmission is getting higher and higher,the matching requirements of the construction machinery and equipment have become more sophisticated,if you follow the traditional Stringing construction technology,part of the regular machinery and equipment will not be able to meet the load requirements,resulting in waste of resources and increase costs.Through technological innovation and application of new '2×One Pull Three 'tension stringing process,the load on the existing machinery and equipment will meet the basic requirements,and avoid a large purchase of new equipment,save a lot of money,and improve construction efficiency,creating a new tension stringing construction process.
出处 《安徽电力》 2012年第4期63-67,共5页 Anhui Electric Power
关键词 输电线路 张力架线 新型2×一牵三 施工工艺 transmission line tension stringing new '2×one pull three' construction process
  • 相关文献

同被引文献9

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部