摘要
结合珠江三角洲城际快速轨道广州至佛山段二期土建施工二标段东平站项目超长超重连续墙钢筋笼吊装施工实例,介绍了1台100t履带吊吊臂长度计算、吊点设置、钢筋吊装技术以及滑轮、卡环、钢丝绳验算过程。
Intercity rapid rail transit in the Pearl River Delta,Guangzhou and Foshan two civil construction combined with two tenders the Dongping station project long overweight continuous wall reinforcement cage hoisting construction instance,a 100t crawler crane jib length hanging point setting,reinforcedcage hoisting technology and pulleys,snap ring,rope checking process.
出处
《广东土木与建筑》
2012年第11期36-38,共3页
Guangdong Architecture Civil Engineering
关键词
超长
钢筋笼
连续墙
吊装技术
ultra-long
reinforcement cage
continuous wall
hoisting technology