摘要
通过对广州市对口援建汶川地震灾后恢复重建项目——穗威大桥及滨江南路棚洞工程的设计、施工方案的比较,从技术上先进可行、经济上合理的角度出发,重点分析了技术难点部位、工期关键节点等的造价管理与控制。
The paper discusses the reconstruction project after Wenchuan earthquake,Sui Wei Bridge and South Binjiang Road Tunnel Shed,which will be reconstructed with Guangzhou city aiding.Based on the comparison on the project design and construction measure,taking account of advanced technology and rational economy,hereby it also analyzes the cost management and control of the technology difficulties,critical point for the construction process.
出处
《广东土木与建筑》
2013年第5期59-61,58,共4页
Guangdong Architecture Civil Engineering
关键词
汶川地震灾后恢复重建
穗威大桥
滨江南路棚洞工程
造价管理及控制
the reconstruction project after Wenchuan earthquake
Sui wei bridge
South Binjiang Road tunnel shed engineering
the cost administration and control