摘要
以佛山市第二水源首期项目—净水工程为例,对滤梁、滤板施工工艺进行研究,安装过程中通过可调式底托、特制钢制专用模板等技术措施,提高了滤梁、滤板的安装精度,确保滤池的施工质量,可为同类施工提供参考借鉴。
Take the water purification project of the Foshan's second water source for example,to study the filter beam and the filter board construction technology.In the installation process of the filter beam and the filter board,through the adjustable tap,special steel templates and other technical measures,to improve the installation precision of the filter beam and the filter board,to ensure the construction quality of filter,the results can provide reference for similar construction.