大型发电机组电气系统整套起动试验常见问题及其处理措施 被引量:2

Total start-up tests for electrical system in large power plants: common problems and countermeasures
下载PDF
导出
摘要 通过对大容量机组电气系统的整套起动试验,汇总和总结了近年来大容量机组电气系统整套起动试验过程中常见的操作、设备配置、设计及安装质量等问题,对其规律性进行了分析,并提出了应严格按照试验方案以及操作票执行操作,在电气系统合闸监视回路中增加串联断路器常闭触点等防范措施。 Common problems about operation,configuration,design and installation quality that occurred during the total start-up tests for electrical system in large scale power plants were summarized.The regularity of these problems was analyzed,and such countermeasures as operating according to the experiment program and operation order strictly,adding series tripping normally closed contact in switch monitoring circuit for electrical system were put forward.
出处 《热力发电》 CAS 北大核心 2013年第1期100-102,共3页 Thermal Power Generation
关键词 大容量机组 电气系统 整套起动 设备配置 安装质量 large generator electrical system total start-up configuration operation design installation quality
  • 相关文献

参考文献3

二级参考文献14

共引文献54

同被引文献7

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部