350MW机组热网改造后RB控制研究 被引量:1

RB protection after heat supply network transformation for a 350MW unit
下载PDF
导出
摘要 介绍了某亚临界350MW纯凝发电机组改造为抽汽供热机组的供热改造系统。对热网投入运行中机组辅机故障减负荷RB保护动作热网退出逻辑进行了分析研究。结果表明,热网改造后,机组RB功能须相应改动:当发生送风机、一次风机、引风机RB动作时,对抽汽快关阀、逆止阀关闭指令加入10s延时;将电动调整蝶阀LV改为液压控制,以便快速开启阀门。 The modification that a subcritical 350 MW straight condensing unit was transformed into a steam extraction heat supply unit was presented,and the RB protection with quitting logic for the heating network during operation was analyzed.Results showed that,after heating network transformation,the RB protection action should be correspondingly changed:when the RB action for forced draft fans,primary air fans and induced draft fans occurred,add a 10-second delay for closing of the heating network quick closing valve and the check valve;to quickly open the motor operated adjusting butterfly valve LV,transform it into being hydraulic controlled.
出处 《热力发电》 CAS 北大核心 2013年第3期90-91,97,共3页 Thermal Power Generation
关键词 亚临界 350 MW机组 纯凝 抽汽供热 RB保护 逻辑 subcritical 350 MW unit straight condensing unit steam extraction heat supply RB protection logic
  • 相关文献

参考文献2

  • 1三河发电有限责任公司.350 MW机组集控运行规程,2011.
  • 2北京国电华北电力工程有限公司.三河发电有限责任公司1、2号机组抽汽供热技改工程初步设计说明书,2009.

同被引文献5

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部