摘要 对国电九江电厂四期7号660MW机组给水和烟风系统的重要辅机进行单列优化布置,该机组是国内首台投入商业运行的高参数超超临界660MW辅机单列机组。通过分析和总结辅机单列方案的特点,对控制系统进行逐层优化,提高了辅机系统的安全性、可靠性、稳定性和运行检修便利性,对同类型机组具有指导作用。 The No.7 660MW unit in Guodian Jiujiang Power Plant was the first domestic high parameter ultra supercritical 660MW unit with auxiliary equipments in sing-line arrangement that put into commercial operation.Optimization on single-line arrangement of the feedwater and airflue gas system was performed.By analyzing and summarizing the characterisitics of the singleline arrangement scheme for auxiliary equipments,the control system was optimized step by step.After the optimization,the system security,reliability,stability and convenience during operation and maintenance were dramatically improved.
出处 《热力发电》 CAS 北大核心 2013年第7期144-146,共3页 Thermal Power Generation
关键词 超超临界 660 MW机组 辅机单列配置 控制系统 660MW unit ultra supercritical auxiliary equipment single row configuration control system
  • 相关文献

参考文献4

二级参考文献10

  • 1Qiurong Chen, Gunter Scheffknecht. New Boiler and Piping Materials Design Consideration for Advanced Cycle Conditions. Power Plants in Competition-Technology, Operation and Environment[ C]. VGB Conference, March,2003. Cologne, Germany.
  • 2Feng Weizhong. Comprehensive Prevention of Steam Oxidation and Solid Particle Erosion of Ultra Supercritical Unit. Supercritical Coal: Operating Experience & Technology Developments[ C]. IMechE, January, 2007, London UK.
  • 3Adrain Smith. E. ON UK Plant for Kingsnorth-New Supercritical Coal Build. Supercritical Coal: Operating Experience & Technology Developments [ C ]. IMechE, January, 2007, London UK.
  • 4Ario Hotta. Lagiza 460MWe CFB Project with Supercritical Steam Parameters. Supercritical Coal: Operating Experience & Technology Developments [ C ]. IMechE, January, 2007, London UK.
  • 5Christian Fielenbach etc. Supereritical Lignite-Fired Boiler for RWE's New Unit. Supercritical Coal: Operating Experience & Technology Developments [ C ]. IMechE, January, 2007, London UK.
  • 6GuenterBaur. International Experience with Tower Type Supercritical Boilers. Supercritical Coal: Operating Experience & Technology Developments [ C ]. IMechE, January, 2007, London UK.
  • 7冯伟忠.GW级SIMENS汽轮机的技术特点.华东电力,2003,31.
  • 8GB50660-2011,大中型火力发电厂设汁规范[S].
  • 9冯伟忠.上海外高桥第三发电有限责任公司实现首次大型汽动给水泵组低速启动及运行[J].华东电力,2007,35(12):40-40. 被引量:1
  • 10冯伟忠.上海外高桥第三发电有限责任公司工程第一台锅炉冲管中首次成功实施[J].华东电力,2007,35(12):115-115. 被引量:1

共引文献36

同被引文献23

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部