摘要
分析园林工程施工特点,总结施工进度影响因素,提出园林工程施工进度管理目标和内容,指出为保证施工进度管理目标顺利实现,必须做好事前计划、事中控制、事后补救,采取有效的进度管理方法。
This paper analysed the construction characteristics of landscape engineering ,construction progress influencing factors were summarized.Target and content of construction schedule management were proposed.In order to ensure the realization of construction schedule management goals , schedule plan must be made beforehand and controlled during the matter and help after the mat -ter.Relevant schedule management method should be taken.
出处
《福建林业科技》
北大核心
2013年第4期174-176,共3页
Journal of Fujian Forestry Science and Technology
基金
中央财政支持高等职业学校专业建设--园林工程技术专业
关键词
园林工程项目
进度管理
动态控制
landscape engineering project
construction schedule management
dynamic control