国际工程索赔权论证中处理开脱性条款的原则与实践 被引量:4

PRELIMINARY STUDY ON HOW TO OVERCOME OBSTACLES CAUSED BYEXCULPATORY CLAUSES IN ARGUMENTATION OFRIGHT OF CLAIM
下载PDF
导出
摘要 在国际工程承包中,索赔权的论证是承包商进行索赔的第一步,而合同中业主加入的开脱性条款往往给索赔权的论证带来困难。如何克服这一困难,使索赔获得成功,是国际工程承包界需要研究和解决的一个难题。文章提出解决这一问题的若干原则和方法,并给出两个案例。 The argumentation of the right of claim is the first step in the process of claiming.Yet it is often made difficult by the exculpatory clauses of the contract made by the employer.Therefore,how to overcome this obstacle and bring the claim to success is a major problem to be solved.The present paper is aimed to study this problem and attempt present some principles and methods for its solution.Two cases are given to illustrate how they are applied in the international project practice.
出处 《天津大学学报(社会科学版)》 1999年第3期179-182,共4页 Journal of Tianjin University:Social Sciences
关键词 国际工程 索赔权 开脱性条款 international project,right of claim,exculpatory clauses
  • 相关文献

参考文献1

  • 1梁〓.国际工程施工索赔[M]中国建筑工业出版社,1996.

同被引文献16

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部