基于Monte Carlo法的飞行器风险动态分析 被引量:1

Dynamic Analysis of Risk in Aircraft Research Project Based on Monte Carlo Method
下载PDF
导出
摘要 飞行器研制项目具有时间周期长,研制费用高,风险大的特点,需要对项目进行整个周期内的动态综合管理。本文在Markov假设基础上,分阶段研究风险状态,并利用Monte Carlo仿真,计算出风险变化趋势。本方法利用有限的评估数据与历史数据,计算出风险转移强度,动态地评估了风险的发展变化。通过实例证明转移矩阵能够准确描述风险的发展变化且与实例情况相吻合。 The risk of aircraft research project has character of long term,high cost and risk.It is necessary to dynamically manage risk during the whole project cycle.Based on Markov assumption,risk status in every stage is analyzed and risk trend is calculated with Monte Carlo method.The limited assessment and history data are utilized farthest to calculate transfer intensity of risk and development of risk was given through dynamic analysis in this paper. The example was presented to prove that transfer matrix can describe the risk development exactly in reality.
出处 《中国管理科学》 CSSCI 2008年第S1期128-132,共5页 Chinese Journal of Management Science
基金 项目技术风险评估方法研究
关键词 飞行器研制项目 风险评估 马尔可夫过程 MONTE Carlo仿真 aircraft research project risk assessment Markov process Monte Carlo simulation
  • 相关文献

参考文献8

二级参考文献27

共引文献69

同被引文献7

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部