基于时间约束网络的项目实施冲突识别算法 被引量:2

Project Implementation Conflict Detection Algorithm Based on Temporal Constraint Network
下载PDF
导出
摘要 提出了一种基于时间约束网络的项目实施冲突识算法。以项目实施网络连接的逻辑结构为基础,建立了项目实施过程网络。在定性时间约束和定量时间约束及其转换规则的基础上,提出了项目实施过程网络到时间约束网络的转换规则。分析了实施冲突,并建立了基于计算机的项目实施冲突识别算法。最后,运用上述方法对某软件系统设计及开发项目实施进行冲突检测。 A conflict detection algorithm is proposed to detect project implementation conflict.Firstly,project connection relations and its implementation process network are constructed based on logic construction.Secondly, based on qualitative and quantitative temporal constraint and their transform rules,project implement process network was converted into temporal constraint network and quantitative temporal constraint network.Thirdly,the conflict of project implementation was analyzed and its algorithm of conflict detection for computer was proposed.Finally, the theory is validated by a case study and perspeetives of future research are also given.
作者 黄喜 于天飞
出处 《中国管理科学》 CSSCI 2008年第S1期197-201,共5页 Chinese Journal of Management Science
基金 中国科学院青年基金(0700561C01)
关键词 逻辑结构 时间约束 时间转换规则 项目实施冲突 logic construction temporal constraint temporal transform rule conflict detection
  • 相关文献

参考文献11

  • 1马国丰,尤建新,杜学美.识别关键冲突任务的定量分析[J].上海交通大学学报,2006,40(4):669-671. 被引量:11
  • 2Lottaz C,Smith I F C,Robert-Nicoud Y,et al.Constraint-based support for negotiation in collaborative designArtificial Intelligence,2000.
  • 3Allen J F.Maintaining knowledge about temporal intervalCommunications of the ACM,1983.
  • 4Meiri I.Combining qualitative and quantitative constraints in temporal reasoningArtificial Intelligence,1996.
  • 5Belhe U,Kusiak A.Modeling relationships among design activitiesJournal of Mechanical Design,1996.
  • 6Hardie,N.The prediction and control of project duration: a recursive modelInternational Journal of Project Management,2001.
  • 7Vilain M,Kautz H.Constraint propagation algorithms for temporal reasoning,1986.
  • 8Vilain M.A systems for reasoning about timeIn: Proceeding of AAAI- Pittsburgh PA,1982.
  • 9Alan K.MackworthArtificial Intelligence,1985.
  • 10H.James Harrington.Project Change Management M,2000.

二级参考文献10

  • 1马国丰,屠梅曾,史占中.基于TOC的项目管理技术模型[J].系统工程理论方法应用,2005,14(1):84-87. 被引量:16
  • 2潘开灵 尹柳营.用制约因素理论指导企业技术进步[J].中国学术期刊文摘,1997,3(4).
  • 3Goldratt E M.Critical chain[M].NY:North River Press,1997.
  • 4Cotterell S.Prochain project scheduling[J].Project Management Today,1998,(6):31-35.
  • 5Newbold R C.Project management in the fast lane:Applying the theory of constraints[M].Boca Raton.Florida:St,Lucie Press,1998.
  • 6Goldratt E M.It's not luck[M].Aldershot,England:Gower,1994.
  • 7Goldratt E M.What is this thing called the theory of constraints?[M].NY:The North River Press,1990.
  • 8Goldratt E M,Cox J.The goal[M].Aldershot,England:Gower,1993.
  • 9马国丰,潘开灵.项目进度制约因素管理理论的基本原理[J].技术经济与管理研究,2001(2):57-57. 被引量:15
  • 10马国丰,屠梅曾.制约因素在项目进度管理的应用[J].管理工程学报,2002,16(4):72-75. 被引量:51

共引文献10

同被引文献21

  • 1Andreas F W. Safe Distributed Coordination of Heterogeneous Robots Through Dynamic Simple Temporal Networks[D]. [S. 1.]: MIT Press, 2003.
  • 2Peter J S, Martha E P. Planning with Disjunctive Temporal Constraints[C]//Proc. of the 19th National Conference on Artificial Intelligence. [S. 1.]: IEEE Press, 2004.
  • 3Dechter R, Meiri I, Pearl J. Temporal Constraint Networks[J]. Artificial Intelligence, 1991, 49(1-3): 61-95.
  • 4Xu Lin, Berthe Y C. A New Efficient Algorithm for Solving the Simple Temporal Problem[C]//Proc. of the 10th International Symposium on Temporal Representation and Reasoning and the 4th International Conference on Temporal Logic, [S. l.]: IEEE Press, 2003.
  • 5Amedeo C, Angelo O, Stephen S. A Constraint Based Method for Project Scheduling with Time Windows[J]. Journal of Heuristics, 2002, 8(1): 109-136.
  • 6Mackworth A K, Consistency in Networks of Relations[J]. Artificial Intelligence, 1977, 8(1): 99-118.
  • 7Mackworth A K, Freuder E C. The Complexity of Some Polynomial Network Consistency Algorithms for Constraint Satisfaction Problems[J]. Artificial Intelligence, 1985, 25(1): 65-74.
  • 8Nitesh Khilwani et al. A methodology to design virtual cellular manufacturing systems[J].Journal of Intelligent Manufacturing, 2011,22:533-544.
  • 9Saadettin Erhan Kesen. A mixed integer programming formulation for scheduling of virtual manufacturing cells (VMCs)[J].Int J Adv Manuf Technol,(2010) 47:665-678.
  • 10F. Liang, R.Y.K. Fung,Z.Jiang.Modelling approach and behaviour analysis of manufacturing resources in virtual cellular manufacturing systems using resource element concept[Jl. International Journal of Computer Integrated Manufacturing, 2011,24(12):1168-ll82.

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部