浅谈灰腾梁300MW风电特许权项目总进度计划的编制

General Schedule Planning Workout of Wind Power Plant Concession Project of Huitengliang 300MW
原文传递
导出
摘要 风电特许权项目是通过招标方式选择财务状况好、电价合理、风机本地化等最优的项目业主。在特许期25年内完成项目设计、投资、建设、运营、维护和拆除。编制风电特许权项目管理规划和总进度计划,制定合理、可行的建设工期,是一项十分重要的工作,它涉及项目融资、风机生产、勘探与设计、施工进度和项目验收计划。 Through bidding, a project corporate will be confirmed for Wind Power Plant Concession Project. Eligible Bidder will be chosen to have adequate financial ability, reasonable electric tariff, and qualified Wind Turbine Generator System localization rate and so on. It will take to complete the project design, investment, building, operation, maintenance in concession period of 25 years. Project proposal comprises a project management plan and life cycle plan. It is very important work for confirming a reasonable and feasible construction period. Bidder will prepare a planning for Finance, WTGS Manufacture, Survey and Design, Project Construction and Project acceptance.
作者 杨本平
出处 《建筑经济》 北大核心 2007年第S2期110-112,共3页 Construction Economy
关键词 风电特许权项目 项目管理规划 总进度计划 工作分解结构 wind power plant concession project project management plan general schedule planning WBS
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部