期刊文献+

太原机场改扩建工程总承包管理任务规划

Planning for General Contract Management of Taiyuan Airport Reconstruction and Extension Project
原文传递
导出
摘要 结合太原机场改扩建工程项目探讨了总承包管理任务规划的类型和编制的内容及要求。首先简要介绍了太原机场改扩建工程项目工程概况。其次结合该项目实际情况和我国目前实行建设工程总承包模式的现状,指出了探索总承包管理任务规划的必要性,并阐述了总承包管理任务规划的类型。最后从编制依据和原则、总承包项目管理组织架构、项目勘察设计工作的组织、项目施工阶段的管理规划等方面论述了太原机场改扩建工程总承包管理基本实施任务规划。 This thesis introduces to us Taiyuan airport reconstruction and extension project and discusses types of the plan for general contract management as well as establishment contents and requirements.Firstly,it presents the general situation of Taiyuan airport reconstruction and extension project.Secondly,it points out the necessity of the plan for the general contracting management and then describes the types of plan for it,together with the project itself and the national situation of construction project of implementing the general contracting mode.Finally,it discusses the basically implemented plan for the general contracting management of Taiyuan airport reconstruction and extension project on the basis of the establishment principles,the management scheme,surveying and designing,the plan for the construction management and so on.
作者 赵俊鸿
出处 《建筑经济》 北大核心 2007年第S1期135-138,共4页 Construction Economy
关键词 太原机场改扩建工程 总承包管理 任务规划 Taiyuan airport reconstruction and extension project general contract management planning
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部