工程造价领域中快速估算的方法与研究 被引量:2

Study and Methodology of Quick Project Cost Estimate
原文传递
导出
摘要 投资估算是指在项目投资决策过程中,依据现有的资料和特定的方法,对建设项目的投资数额进行的估计。如何在保证计算精度较高的前提下,采用简单易懂的方式,省去大量繁琐的工程量计算,从而确保在有限的时间内,对工程造价进行快速合理的估算,成为广大造价人员关注的重要问题。 Project investment/cost estimate is to forecast and calculate the investment amount of a project to be constructed,by using available data and specific methods,during the prior-investment decision stage.How to ensure,with high accuracy in calculation,a simple and practical method is applied to save the cost estimate from complicated and heavy load calculation,so as to ensure that within a limited period of time,the cost estimate is carried out promptly and appropriately,which has become an important issue attracting a lot of attentions from cost estimators.
出处 《建筑经济》 2011年第S1期125-127,共3页 Construction Economy
关键词 快速估算 工程造价 造价指标 quick estimate project cost cost indicators
  • 相关文献

参考文献1

二级参考文献3

  • 1薛瑜,李志民.通过商品住宅的广告探讨城市住宅的发展趋势[J].山西建筑,2007,33(1):16-17. 被引量:3
  • 2国家计委.投资项目可行性研究指南[M].北京:机械工业出版社.2002.
  • 3Steven M,Trost, Garold D. Oberlender: Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression[J]. Journal of Construction Engineering and Managemnet, 2003,129 (2) : 198-204.

共引文献1

同被引文献20

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部