摘要
从索赔、反索赔含义入手,介绍业主反索赔的种类,具体分析了工期延误的分类、责任识别,以及对项目业主的不良影响,重点剖析了因工期延误造成的业主损失,并建立一个计算模型,为业主反索赔中因工程延误的索赔量的确定提供了理论依据。
Started with the concepts of claim and counter claim,the kinds of the clients'counter claim,the types of project delay,the responsibility identification,and the effects of engineering delay to the employer are analyzed concretely.The employer's engineering delay loss is discussed,setting up a mathematic model which providing theory basis for the engineering delay claim quantity in clients'counter claim.
出处
《建筑经济》
2009年第S2期149-152,共4页
Construction Economy
关键词
业主反索赔
工期延误
损失
计算模型
clients' counter claim
delayed schedule
loss
calculation model